Why automation and AI projects fail

When an automation or AI project does not deliver what it promised, the tool is rarely to blame. Usually something was already unclear before the start – and that can be spotted.

Published
Reading time
8 min

Most automation and AI projects do not fail because of the technology, but because of things that were left unresolved before the start: the problem is not clearly named, the process is not described, there is no baseline, the first step is too big, exceptions are underestimated, the data cannot be reached, or nobody is responsible. All seven reasons can be spotted before the start – and that is when they are cheapest to fix.

Almost every business I speak to has digitalised something at some point that then did not work out as planned. A tool that nobody uses any more after three months. An automation where someone still checks every case. An AI trial that impressed in testing and never arrived in day-to-day work.

The sentence “We tried that once, it didn’t work” is therefore not an argument against automation. It is a pointer to where to look more closely next time.

The situation

What is known about failure

Reliable figures on project failure are rare. Hardly any company publishes what did not work. Three sources still give a direction:

  • RAND (2024) asked 65 experienced data scientists and engineers why AI projects fail. The study cites estimates according to which more than 80 per cent of all AI projects fail – twice as many as IT projects without AI. The most common cause, in the view of those interviewed: the people involved did not properly understand, or did not clearly communicate, the problem to be solved.
  • Gartner forecast in July 2024 that at least 30 per cent of generative AI projects would be abandoned after the proof of concept by the end of 2025. The reasons: poor data quality, inadequate risk controls, escalating costs or unclear business value.
  • For agentic AI projects, Gartner expects (June 2025) that more than 40 per cent will be cancelled by the end of 2027, for similar reasons.

The forecasts are not measurements, and the figures mostly relate to larger companies. What is striking, though, is what none of the three sources puts first: the technology.

Seven reasons

Seven reasons, and how to spot them in advance

1. The solution comes before the problem

The project starts with “We should do something with AI” or with a tool someone has seen. Only then does anyone look for a process to fit it. RAND describes exactly this as a separate cause: teams chase the latest technology instead of a real problem.

Warning sign: nobody can say in one sentence which process will run differently afterwards and how you would notice.
Remedy: start with a specific process and its economic problem. The technology comes last.

2. The process has not been described

Many processes work because experienced employees know what to do. Little of it is written down: which details go where, when to ask back, which customers get special treatment. An automation can only map what someone has put into words.

Warning sign: ask “How exactly does this work?” and three people give three different answers.
Remedy: write the process down with the people who do it every day, for example with the Process Profile. This often already shows what can be simplified before anything is automated. Michael Hammer warned as early as 1990 against pouring existing processes unchanged into software.

3. There is no baseline

Without figures before the project, there is no way to show afterwards what it achieved. Then gut feeling decides, and with anything new it often comes out critical. Gartner names “unclear business value” in both forecasts as a reason for projects being dropped.

Warning sign: the question “How many cases are there a month, and how long does one take?” is answered with “lots” and “a while”.
Remedy: measure for two weeks beforehand, even roughly. The “Measure First” tracking sheet is made for this.

4. The first step is too big

The process with the greatest potential is often also the one with the most people, systems and special cases. Starting there means a long project with many dependencies ahead – and for a long time nothing that already helps in day-to-day work.

Warning sign: the project has no clear end, or the end is more than a few months away.
Remedy: start with a well-defined, frequent process that quickly shows whether the approach holds. How to choose it is described in the article Which process should you automate first?

5. Exceptions are underestimated

In conversation, every process sounds simple. In day-to-day work there are attachments in the wrong format, customers with two delivery addresses and orders that were half changed by phone. If every exception is automated too, the project becomes expensive and fragile. If none is considered, everything ends up back with a person.

Lisanne Bainbridge described a further effect in 1983: what remains with people after automation are the difficult cases, and those need more experience, not less.

Warning sign: nobody can say how large the share of special cases is.
Remedy: automate the standard case and decide from the outset which cases go to whom. Exceptions are counted, not planned away.

6. The data cannot be reached or is not clean

The best logic does not help if the information is on paper, sits in a legacy system without an interface or is kept differently in three Excel lists. RAND and Gartner each name missing or poor data as a separate cause.

Warning sign: the process needs information where nobody knows exactly where the current version is.
Remedy: check early which systems are involved and how to get at the data – via an interface, an export or a mailbox. Sometimes tidying up the data is the real first project. How systems fit together cleanly is covered on the page about system integration for SMEs.

7. Nobody is responsible, neither before nor after

An automation needs someone in the company who knows the process, decides on rules and takes care of things when something changes: a new form from a supplier, a new field in the system, a new price list. Without this person, even a good solution goes out of date. On top of that come running costs for licences, AI usage and maintenance that often nobody put a figure on before the start.

Warning sign: the question “Who decides when the system classifies something wrongly?” is met with silence.
Remedy: name a responsible person before the start and involve the employees who will work with the solution. Operation and maintenance belong in the calculation, not just the set-up.

Almost every failed project left a question open before it started.

Perspective

Is Germany behind on AI?

In connection with failed projects, you often hear that Germany and Europe have fallen behind on AI anyway. For use in companies, the figures from Eurostat, the European statistics office, paint a more nuanced picture.

Enterprises with 10 or more employees using at least one AI technology20242025
Denmark (highest in the EU)27.6%42.0%
Austria20.3%30.0%
Germany19.8%26.0%
EU average13.5%20.0%
France9.9%18.2%
Italy8.2%16.4%

Germany is above the EU average for AI use in companies, but clearly behind the Nordic countries. The bigger difference, however, is not between countries but between company sizes: in Germany in 2025, around 23 per cent of companies with 10 to 49 employees used AI, around 36 per cent of those with 50 to 249 employees and around 57 per cent of large companies.

The reasons why companies do not use AI are revealing. Of the companies in the EU that had considered using it but had not done so, around 71 per cent in 2025 cited a lack of expertise, around 53 per cent a lack of clarity about legal consequences and around 49 per cent data protection concerns. Only around 21 per cent said that AI was not useful for their company.

So the bottleneck is rarely the technology. What is missing is knowing where AI helps in your own processes, and clarity about the framework. These are the same gaps that individual projects fail on.

I have deliberately left out comparisons with the USA or China here. The available surveys measure different things and cannot be compared cleanly with the Eurostat figures.

Seven questions before you start

Anyone planning an automation or AI project can ask themselves seven questions beforehand. Every “don’t know” is not a reason to call it off, but a point to clarify before the start.

  • Which process should run differently afterwards, and how will we notice?
  • Is the process written down well enough for someone new to understand it?
  • How many cases are there a month, and how long does one take today?
  • Does the project have a clear end that can be reached within a few months?
  • How large is the share of special cases, and who handles them?
  • Where is the data we need, and can we get at it technically?
  • Who is responsible, and what does it cost to run after the start?

The next step

It helps most to go through the questions using a specific process. The Process Profile captures the process on one page; the tracking sheet provides the baseline. Whether it all pays off is covered in the article When is process automation worth it?

If you are currently wondering whether a process needs an AI agent, the distinction is explained in the article AI agent, chatbot or workflow.

Sources

  1. James Ryseff, Brandon F. De Bruhl, Sydne J. Newberry: The Root Causes of Failure for Artificial Intelligence Projects and How They Can Succeed. RAND Corporation, RR-A2680-1, 2024.⁠ (opens in a new window)

    Interviews with 65 experienced data scientists and engineers. Names five root causes, first among them a misunderstood or poorly communicated problem. The “more than 80 per cent” is an estimate cited in the study, not a result of its own measurement.

  2. Gartner: Gartner Predicts 30% of Generative AI Projects Will Be Abandoned After Proof of Concept By End of 2025. Press release, 29 July 2024.⁠ (opens in a new window)

    A forecast. Reasons: poor data quality, inadequate risk controls, escalating costs, unclear business value.

  3. Gartner: Gartner Predicts Over 40% of Agentic AI Projects Will Be Canceled by End of 2027. Press release, 25 June 2025.⁠ (opens in a new window)

    A forecast for agentic AI projects. Reasons: escalating costs, unclear value, inadequate risk controls.

  4. Eurostat: Use of artificial intelligence in enterprises. Statistics Explained, data as of December 2025; dataset isoc_eb_ai.⁠ (opens in a new window)

    Share of enterprises with 10 or more employees using at least one AI technology, by country and size. Reasons for not using AI refer to enterprises that considered using it but did not (EU average).

  5. Michael Hammer: Reengineering Work: Don’t Automate, Obliterate. Harvard Business Review, July/August 1990.⁠ (opens in a new window)

    Basis for the advice to simplify existing processes before automating them, rather than transferring them unchanged into software.

  6. Lisanne Bainbridge: Ironies of Automation. Automatica, 19(6), 1983, pp. 775–779.⁠ (opens in a new window)

    What is not automated is often the difficult tasks, and people need more practice for them, not less. Written in the context of industrial process control.

Would you like to look at a specific process together? Arrange an initial call